Skip to content
noctiluz
On this page

Run and see results

Running a tab executes its nodes in dependency order: a node runs after everything wired into it. Results appear on the nodes themselves, so you can read the answer where you built it.

Run#

  1. Click Run in the header (or choose Run tab in the Ctrl/Cmd+K palette) to run the whole tab.
  2. To re-run only part of the graph, select a node and click Run from here in its details panel. It runs that node and everything that depends on it, and reuses the upstream results.
  3. Watch the status dot on each node: Ran successfully, Run failed or Skipped. A message sums up the run: "Run finished: 5 nodes executed" when everything worked, or "Run finished: 3 succeeded, 1 failed, 1 skipped" when something did not.

A node wired to one that failed or was skipped is skipped too. It never runs on missing data and passes an empty result off as a clean one. Many source nodes spend a small amount of credits, and your plan has a daily limit of node runs.

Read the results#

Tables, charts, maps and entity cards render inside the node. Select a node and its details panel shows the output, and View full output shows the raw result with a Copy output button.

To inspect any wire, connect it to a Display node (Utilities, Notes & display), which accepts any kind of value. Statistics nodes add one for you through their Show the result in a Display setting. Turn it off to remove it.

Full View#

Long text and files get an Expand button. It opens the content in Full View, for Markdown text such as an AI report, and for image, Markdown and PDF files. You can zoom, choose Fit to screen or Actual size, page through a PDF and Download the file. A file too large to open says so and offers the download.

Run history#

The Executions tab of the left panel lists the runs of the tab: Full run, From node or Scheduled run, each with its status and counts of ok, failed and skipped nodes. A very large output keeps only a preview.

Next: Sections, comments and undo.